An investment evaluation and incentive allocation model for public-private partnerships in renewable energy development projects

被引:2
|
作者
Darmian, Sobhan Mostafayi [1 ]
Tavana, Madjid [2 ,3 ]
Ribeiro-Navarrete, Samuel [4 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Mech & Ind Engn, Trondheim, Norway
[2] La Salle Univ, Distinguished Chair Business Analyt, Business Syst & Analyt Dept, Philadelphia, PA 19141 USA
[3] Univ Paderborn, Fac Business Adm & Econ, Business Informat Syst Dept, Paderborn, Germany
[4] Univ Tecnol Atlant Med, UTAMED, Malaga, Spain
关键词
Public -private partnership; Digital services companies; Renewable energy development project; Multicriteria decision-making; Bi-level optimization; Heuristic algorithm; MULTICRITERIA DECISION-MAKING; FUZZY TOPSIS; MCDM; SELECTION; TECHNOLOGIES; PRIORITIZATION; RESOURCES; SYSTEMS; TURKEY; SUSTAINABILITY;
D O I
10.1016/j.seps.2024.101953
中图分类号
F [经济];
学科分类号
02 ;
摘要
This study proposes an investment evaluation and incentive allocation model for public -private partnerships (PPPs) in renewable energy development projects (REDPs). A hybrid multicriteria decision-making (MCDM) and bi-level optimization model are proposed to evaluate investment opportunities and allocate government financial incentives (GFIs) to REDPs. The best-worst method (BWM) is used to weigh the evaluation criteria. VIKOR and grey relational analysis (GRA) rank and allocate GFIs to the private sector companies selected to participate in the REDPs. The government uses the PPP to persuade digital services companies in the private sector to invest in underdeveloped REDPs using financial incentives with minimal risk and maximum return. An iterative fullenumeration-based heuristic model is developed to handle the computational intractability in the bi-level model. The computational results show that political and financial support and land use are the most and the least important criteria, respectively. Moreover, we show that the government prefers to allocate a significant portion of its GFIs to waste heat recovery and hydropower in partnership with digital services companies. The results from the bi-level model help government agencies and policymakers offer equitable incentive programs in the energy sectors.
引用
收藏
页数:23
相关论文
共 50 条
  • [1] DEVELOPMENT OF REGIONAL RENEWABLE ENERGY PROJECTS IN ROMANIA THROUGH PUBLIC-PRIVATE PARTNERSHIPS
    Zamfir, Andreea
    PROCEEDINGS OF THE 6TH INTERNATIONAL MANAGEMENT CONFERENCE: APPROACHES IN ORGANISATIONAL MANAGEMENT, 2012, : 778 - 784
  • [2] INVESTMENT AND INFRASTRUCTURE DEVELOPMENT PROJECTS IN PUBLIC-PRIVATE PARTNERSHIPS IN UKRAINE
    Lozynska, Tamara
    Birchenko, Nataliia
    Piskun, Alona
    Dengub, Valentyna
    ECONOMICS ECOLOGY SOCIUM, 2024, 8 (04): : 53 - 65
  • [3] Renewable energy public-private partnerships in developing countries: Determinants of private investment
    Fleta-Asin, Jorge
    Munoz, Fernando
    SUSTAINABLE DEVELOPMENT, 2021, 29 (04) : 653 - 670
  • [4] Agency problems in public-private partnerships investment projects
    Silaghi, Florina
    Sarkar, Sudipto
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 290 (03) : 1174 - 1191
  • [5] Priority Model for Public-Private Partnership Investment in Energy Projects
    Elwakil, Emad
    Hegab, Mohamed
    2018 IEEE CONFERENCE ON TECHNOLOGIES FOR SUSTAINABILITY (SUSTECH), 2018, : 173 - 177
  • [6] Risk Allocation of Public-Private Partnerships in Public Stadium Construction Projects
    Cheng Min
    Shi Xiajun
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1338 - 1342
  • [7] Investment possibility based models for public-private partnerships in water projects
    Elwakil, Emad
    Hegab, Mohamed
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (04) : 461 - 469
  • [8] Real option-based optimization for financial incentive allocation in infrastructure projects under public-private partnerships
    Li, Shuai
    Hu, Da
    Cai, Jiannan
    Cai, Hubo
    FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (03) : 413 - 425
  • [9] Real option-based optimization for financial incentive allocation in infrastructure projects under public-private partnerships
    Shuai Li
    Da Hu
    Jiannan Cai
    Hubo Cai
    Frontiers of Engineering Management, 2020, 7 : 413 - 425
  • [10] Environmental sustainability and public-private partnerships investment in energy in Bangladesh
    Kirikkaleli, Dervis
    Ali, Minhaj
    Altuntas, Mehmet
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (37) : 56068 - 56078