Two-stage task allocation for multiple construction robots using an improved genetic algorithm

被引:1
|
作者
Ye, Xiaotian [1 ]
Guo, Hongling [1 ]
Luo, Zhubang [1 ]
机构
[1] Tsinghua Univ, Dept Construct Management, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
Multiple construction robots; Robot collaboration; Task allocation; GA; MULTIROBOT COORDINATION; OPTIMIZATION;
D O I
10.1016/j.autcon.2024.105583
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry is facing serious challenges, such as labor shortage and safety hazards. Construction robots can perform dangerous and repetitive tasks instead of workers. However, complex construction tasks require multi -robot collaboration, which needs efficient task allocation. This paper describes a two -stage task allocation method using an improved Genetic Algorithm (GA) for multiple construction robots. First, a construction task decomposition and grouping method under construction constraints is established, using a steel structure as example. Second, a Multi -Robot Construction Task Allocation (MRCTA) model is developed by modeling construction robots and tasks. Third, the MRCTA problem is divided into two stages, i.e., determining the optimal construction robot group for each task and the best task sequence for each robot group. Finally, a simulated experiment was designed and conducted. The results show that the method can efficiently find optimal solutions and the improved GA can enhance the diversity to achieve well -adapted solutions.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Two-stage dynamic model on allocation of construction facilities with genetic algorithm
    Chau, KW
    AUTOMATION IN CONSTRUCTION, 2004, 13 (04) : 481 - 490
  • [2] A Problem of Task Allocation with Fuzzy Information and Two-Stage Solution Algorithm
    Nasibov, E. N.
    AUTOMATIC CONTROL AND COMPUTER SCIENCES, 2007, 41 (04) : 196 - 202
  • [3] Heuristic based task allocation algorithm for multiple robots using agents
    Nagarajan, Thareswari
    Thondiyath, Asokan
    INTERNATIONAL CONFERENCE ON DESIGN AND MANUFACTURING (ICONDM2013), 2013, 64 : 844 - 853
  • [4] Improved two-stage task allocation of distributed UAV swarms based on an improved auction mechanism
    Tan, Chaoren
    Liu, Xin
    INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2024, 15 (11) : 5119 - 5128
  • [5] Research on Task Allocation in Multiple Logistics Robots Based on an Improved ant Colony Algorithm
    Li, Juntao
    Dong, Tingting
    Li, Yuanyuan
    2016 International Conference on Robotics and Automation Engineering (ICRAE 2016), 2016, : 17 - 20
  • [6] Two-stage morphological filter design using genetic algorithm
    Jelodar, Mehdi Salmani
    Fakhraie, Seid Mehdi
    Ahmadabadi, Majid Nili
    2006 IEEE INTERNATIONAL CONFERENCE ON ENGINEERING OF INTELLIGENT SYSTEMS, 2006, : 129 - +
  • [7] An Improved Two-stage Acquisition Algorithm in DSSS
    Zhan Yunzhi
    Gan Minggang
    2011 7TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING (WICOM), 2011,
  • [8] Enhancing the Sales Diversity Using a Two-Stage Improved KNN Algorithm
    Berbague, ChemsEddine
    Karabadji, Nour El Islem
    Seridi, Hassina
    MODELLING AND IMPLEMENTATION OF COMPLEX SYSTEMS, 2019, 64 : 193 - 203
  • [9] Robust and stable multi-task manufacturing scheduling with uncertainties using a two-stage extended genetic algorithm
    Ding, Jiepin
    Wang, Yan
    Zhang, Shuai
    Zhang, Wenyu
    Xiong, Zhiying
    ENTERPRISE INFORMATION SYSTEMS, 2019, 13 (10) : 1442 - 1470
  • [10] A two-stage genetic algorithm for automatic clustering
    He, Hong
    Tan, Yonghong
    NEUROCOMPUTING, 2012, 81 : 49 - 59