Strategic Workforce Planning for Production of Prefabricated Bathroom Units: An Advanced Markovian Approach

被引:0
|
作者
Han, Jinchi [1 ]
Chen, Chen [1 ]
Tiong, Robert Lee Kong [1 ]
Wu, Kan [2 ]
Chew, Daryl Kok Hoong [3 ]
机构
[1] Nanyang Technol Univ, Sch Civil & Environm Engn, 50 Nanyang Ave, Singapore 639798, Singapore
[2] Chang Gung Univ, Dept Ind & Business Management, 259 Wenhua Rd 1, Taoyuan 33302, Taiwan
[3] Soil Build Construction Grp Ltd, Innovat & Sustainabil Lead, 23 Defu South St 1, Singapore 533847, Singapore
关键词
Markov Chains; Offsite construction; Prefabricated bathroom unit (PBU); Strategic planning; Workforce planning; OPTIMIZATION METHODS; CHAIN; MODEL; ALGORITHMS; DECISIONS; SYSTEM;
D O I
10.1061/JCEMD4.COENG-14514
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Producing prefabricated bathroom units (PBUs) involves a dry installation method that heavily relies on human labor. Therefore, strategically accomplishing efficient and agile workforce planning emphasizes the critical significance. However, previous studies that address workforce planning often overlook the long-term stochastic effects and assume a homogeneous workforce for the sake of computational simplicity. To overcome these limitations, this study adopts the Markovian approach to establish an explicit relationship between workforce cost and cycle time, considering a heterogeneous workforce and uncertain human-caused events. The proposed model has a hierarchical structure that addresses the behavioral tendencies that drive task allocation at the individual level and the aggregate effect of manpower allocation at the operation level. By integrating Little's law in queuing theory and metaheuristics optimization, the cycle time can be calculated while searching for the optimal workforce arrangement configuration. The study cross-validated the computational results with empirical data from a precast factory in Singapore and conducted a sensitivity analysis to verify the reliability. The results show that cross-training workers to multiple skills can lead to significant time savings, with a maximum of roughly 23 h saved in PBU cycle time. Ultimately, this research contributes to the body of knowledge by proposing a strategic workforce planning model that accounts for a heterogeneous workforce and uncertain human-caused events. It utilizes a partial cross-training configuration strategy to maximize productivity and flexibility for PBU production. The fit-out process of prefabricated bathroom units (PBUs) relies heavily on manual labor, becoming a bottleneck in the supply chain. Efficient and agile workforce planning is critical to overcome this challenge. However, planning for a large, heterogeneous workforce for tasks in an uncertain environment is difficult. Therefore, this research aims to establish a clear relationship between workforce cost and cycle time to assist with quick decision making during the planning stage. The proposed model has a two-level hierarchical structure that addresses individual-level behavioral tendencies and the operational-level aggregate effect of manpower allocation. This approach ensures optimal workforce size, composition, cost, and flexibility for the project's needs. The model was tested using a real-world industrial case study, and the results showed that cross-training workers in multiple skills can significantly reduce PBU cycle time. The increased workforce flexibility is the main factor responsible for the time savings, with a maximum of roughly 23 h saved.
引用
收藏
页数:17
相关论文
共 24 条
  • [1] Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production
    Han, Jinchi
    Chen, Chen
    Tiong, Robert Lee Kong
    Wu, Kan
    AUTOMATION IN CONSTRUCTION, 2024, 166
  • [2] Strategic workforce planning in healthcare: A multi-methodology approach
    Willis, Graham
    Cave, Sion
    Kunc, Martin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 267 (01) : 250 - 263
  • [3] A New Approach to the Strategic Planning of an Advanced Education
    Munteanu, Olimpiu
    Jaliu, Codruta
    Neagoe, Mircea
    Saulescu, Radu
    PROCEEDINGS OF THE 4TH WSEAS/IASME INTERNATIONAL CONFERENCE ON EDUCATIONAL TECHNOLOGIES (EDUTE'08): EDUCATION AND NEW EDUCATIONAL TECHNOLOGIES, 2008, : 106 - 111
  • [4] Optimizing Care Teams by Leveraging Advanced Practice Providers Through Strategic Workforce Planning
    Kuriakose, Clair
    Stringer, Meredith
    Ziegler, Amy
    Hsieh, Chuyun
    Atashroo, Megan
    Hendershott, Joan
    Tippett, Vicki
    Shah, Deepa
    Cianfichi, Lisa
    Katznelson, Laurence
    Mahoney, Megan
    JOURNAL OF NURSING ADMINISTRATION, 2022, 52 (09): : 474 - 478
  • [5] Approach to the Strategic Planning Concept for Agriculture and Livestock Production
    Pena, Maria Elena
    Urdaneta, Fatima
    Casanova, Angel
    REVISTA VENEZOLANA DE GERENCIA, 2010, 15 (50) : 273 - 293
  • [6] Strategic workforce and project planning for engineering automotive production systems: tackling the transition to electric vehicles
    Kolter, Maximilian
    Grunow, Martin
    Kolisch, Rainer
    Stablein, Thomas
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025, 63 (03) : 1105 - 1125
  • [7] A Design Process Approach to Strategic Production Planning for Industry 4.0
    Riel, Andreas
    Flatscher, Martina
    SYSTEMS, SOFTWARE AND SERVICES PROCESS IMPROVEMENT (EUROSPI 2017), 2017, 748 : 323 - 333
  • [8] A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation-Optimization Approach
    Akl, Amany M.
    El Sawah, Sondoss
    Chakrabortty, Ripon K.
    Turan, Hasan Huseyin
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 219
  • [9] A MULTISTAGE APPROACH FOR PRODUCTION AND WORKFORCE PLANNING IN LONG-CYCLE PRODUCT ENVIRONMENTS
    TUNC, EA
    HADDOCK, J
    PRODUCTION PLANNING & CONTROL, 1994, 5 (05) : 465 - 474
  • [10] A new approach to tactical and strategic planning in production-distribution networks
    Bashiri, Mahdi
    Badri, Hossein
    Talebi, Jafar
    APPLIED MATHEMATICAL MODELLING, 2012, 36 (04) : 1703 - 1717