Enhancing Contractor Selection through Fuzzy TOPSIS and Fuzzy SAW Techniques

被引:3
|
作者
Tafazzoli, Mohammadsoroush [1 ]
Hazrati, Ayoub [2 ]
Shrestha, Kishor [3 ]
Kisi, Krishna [4 ]
机构
[1] Georgia Southern Univ, Coll Engn & Comp, Dept Civil Engn & Construction, Statesboro, GA 30458 USA
[2] Univ Nebraska, Coll Engn, Durham Sch Architectural Engn & Construction, Lincoln, NE 68588 USA
[3] Washington State Univ, Voiland Coll Engn & Architecture, Sch Design & Construct, Pullman, WA 99164 USA
[4] Texas State Univ, Coll Sci & Engn, Dept Engn Technol, San Marcos, TX 78666 USA
关键词
prequalification; fuzzy TOPSIS; fuzzy SAW; contractor selection; PRE-QUALIFICATION CRITERIA; DECISION-MAKING MODEL; PROJECT SUCCESS; CONSTRUCTION; PREQUALIFICATION; SYSTEM; IMPACT;
D O I
10.3390/buildings14061861
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Contractors play an integral role in construction projects, and their qualifications directly impact various aspects of a project's success. The unbiased selection of contractors is a challenge in the construction industry worldwide, particularly in public projects where impartiality in the final selection is essential. Numerous factors must be considered when evaluating contractors, making the selection process challenging for the human brain. This paper introduces and compares two methods for assessing contractor prequalification by applying the fuzzy theory. The idea is to facilitate using human judgments in a mathematical system for decision-making with regard to selecting contractors. The method is based on identifying a fuzzy weight for the selection criteria using the Buckley method. Fuzzy TOPSIS and Fuzzy SAW methods are then used for the qualification ranking of the contractors. The proposed models are assessed using a case study. A sensitivity analysis was also conducted to compare the two models. The introduced method is expected to improve the quality of the qualification-based selection of contractors and prevent possible losses from hiring unsuitable contractors.
引用
收藏
页数:24
相关论文
共 50 条
  • [1] Enhancing Fuzzy Topsis for web service selection
    Maheswari, S.
    Karpagam, G. R.
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2015, 51 (04) : 344 - 351
  • [2] CONTRACTOR SELECTION FOR CONSTRUCTION WORKS BY APPLYING SAW-G AND TOPSIS GREY TECHNIQUES
    Zavadskas, Edmundas Kazimieras
    Vilutiene, Tatjana
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    JOURNAL OF BUSINESS ECONOMICS AND MANAGEMENT, 2010, 11 (01) : 34 - 55
  • [3] The fuzzy saw and fuzzy TOPSIS procedures based on ordered fuzzy numbers
    Roszkowska, E.
    Kacprzak, D.
    INFORMATION SCIENCES, 2016, 369 : 564 - 584
  • [4] A fuzzy decision framework for contractor selection
    Singh, D
    Tiong, RLK
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (01) : 62 - 70
  • [5] Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective
    Cai, Jin
    Li, Zhongfu
    Dou, Yudan
    Teng, Yue
    Yuan, Mengqi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (10) : 5073 - 5108
  • [6] Contractor selection:: fuzzy-control approach
    Bendana, Ricardo
    del Cano, Alfredo
    de la Cruz, M. Pilar
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2008, 35 (05) : 473 - 486
  • [7] A fuzzy TOPSIS method for robot selection
    Chu, T.-C. (mrchu@mail.stut.edu.tw), 1600, Springer-Verlag London Ltd (21):
  • [8] A fuzzy TOPSIS method for robot selection
    Chu, TC
    Lin, YC
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 21 (04): : 284 - 290
  • [9] A Fuzzy TOPSIS Method for Robot Selection
    T.-C. Chu
    Y.-C. Lin
    The International Journal of Advanced Manufacturing Technology, 2003, 21 : 284 - 290
  • [10] An extension of fuzzy TOPSIS for personnel selection
    Kelemenis, Alecos M.
    Askounis, D. Th.
    2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 4704 - 4709