共 28 条
- [1] Factors Influencing the Duration of Road Construction Projects in Sri Lanka ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2010, 43 (04): : 17 - 30
- [2] Use of construction and demolition wastes as road sub-base material INTERNATIONAL CONFERENCE ON PRACTICAL APPLICATIONS IN ENVIRONMENTAL GEOTECHNOLOGY ECOGEO 2000, 2000, 204 : 173 - 181
- [7] Use of petroleum-contaminated drilling wastes as sub-base material for road construction Waste Management and Research, 2000, 18 (05): : 489 - 505
- [8] Circular economy strategies for minimising construction waste in Sri Lanka: focus on the preconstruction stage CONSTRUCTION INNOVATION-ENGLAND, 2024,