共 50 条
- [1] Structure rehabilitation utilizing aluminum bridge decking 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 166 - 171
- [2] Structure rehabilitation utilizing aluminum bridge decking 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 166 - 171
- [3] Designing a traffic barrier anchorage system for aluminum bridge decking Light Metal Age, 2019, 77 (05): : 12 - 13
- [6] British ready to deploy Asraam in earnest AVIATION WEEK & SPACE TECHNOLOGY, 2002, 157 (13): : 27 - 27
- [8] A Ready-to-Deploy Platform for the Internet of Things MANUFACTURING ENGINEERING, 2022, 168 (06): : 30 - 32
- [10] Automatic Data Repair: Are We Ready to Deploy? PROCEEDINGS OF THE VLDB ENDOWMENT, 2024, 17 (10): : 2617 - 2630