On-Site Earthquake Early Warning Method for High-Speed Railway Based on Support Vector Machine Prediction Models

被引:0
|
作者
Song, Jindong [1 ,2 ]
Zhu, Jingbao [1 ,2 ]
Liu, Yanqiong [3 ]
Sun, Wentao [4 ]
Li, Shuilong [5 ]
Zeng, Kuiyuan [1 ,2 ]
Wang, Yunlong [1 ,2 ]
Yao, Kunpeng [6 ]
Li, Shanyou [1 ,2 ]
机构
[1] Key Laboratory of Earthquake Engineering and Engineering Vibration, Institute of Engineering Mechanics, China Earthquake Administration, Harbin,150080, China
[2] Key Laboratory of Earthquake Disaster Mitigation, Ministry of Emergency Management, Harbin,150080, China
[3] Department of Seismic Network, China Earthquake Networks Center, Beijing,100045, China
[4] Railway Science and Technology Research and Development Center, China Academy of Railway Sciences Corporation Limited, Beijing,100081, China
[5] Seismic Station of Fujian, Earthquake Administration of Fujian Province, Fuzhou,350003, China
[6] Department of Security Products, HeNan Splendor Science & Technology Co., Ltd., Zhengzhou,450012, China
来源
关键词
Compilation and indexing terms; Copyright 2024 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
Alarm systems - Earthquakes - Forecasting - Railroad transportation - Railroads - Seismic waves
引用
收藏
页码:177 / 187
相关论文
共 50 条
  • [1] Continuous Prediction Method of Earthquake Early Warning Magnitude for High-Speed Railway Based on Support Vector Machine
    Song J.
    Zhu J.
    Li S.
    Zhongguo Tiedao Kexue/China Railway Science, 2021, 42 (03): : 156 - 165
  • [2] Event Confirmation Method for Earthquake Early Warning System of High-Speed Railway
    Shi J.
    Zhongguo Tiedao Kexue/China Railway Science, 2021, 42 (05): : 174 - 182
  • [3] High-Speed Railway Earthquake Early Warning Testing System Based on LabVIEW
    Yu, Haiying
    Ma, Yingchun
    Yu, Tianyang
    ADVANCES IN INTELLIGENT TRAFFIC AND TRANSPORTATION SYSTEMS, ICITT 2022, 2023, 34 : 45 - 54
  • [4] Prediction Based on Support Vector Machine for Travel Choice of High-Speed Railway Passenger in China
    Kang Shu
    Li Jing
    Liu Mei
    Zhu Xin
    2011 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING - 18TH ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2011, : 28 - +
  • [5] Fault Diagnosis of High-Speed Railway Turnout Based on Support Vector Machine
    Zhou, Fenfang
    Xia, Li
    Dong, Wei
    Sun, Xinya
    Yan, Xiang
    Zhao, Qianchuan
    PROCEEDINGS 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT), 2016, : 1539 - 1544
  • [6] Overview of China high-speed railway earthquake early-warning system
    Mingduan Liu
    Kai Liu
    High-speed Railway, 2024, 2 (04) : 274 - 282
  • [7] A P wave-based, on-site method for earthquake early warning
    Colombelli, S.
    Caruso, A.
    Zollo, A.
    Festa, G.
    Kanamori, H.
    GEOPHYSICAL RESEARCH LETTERS, 2015, 42 (05) : 1390 - 1398
  • [8] Prediction of peak ground motion for on-site earthquake early warning based on SVM
    Yu, Cong
    Song, Jindong
    Li, Shanyou
    Zhendong yu Chongji/Journal of Vibration and Shock, 2021, 40 (03): : 63 - 72
  • [9] Research on Warning Threshold Value Optimization and Responding Strategy of Earthquake Early Warning for High-speed Railway
    Yang C.
    Tong X.
    Lian J.
    He H.
    Gao M.
    Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (07): : 88 - 94
  • [10] Continuous prediction of onsite PGV for earthquake early warning based on least squares support vector machine
    Song JinDong
    Yu Cong
    Li ShanYou
    CHINESE JOURNAL OF GEOPHYSICS-CHINESE EDITION, 2021, 64 (02): : 555 - 568