World's first implementation of close-fit pipe jacking of twin tunnels for construction of subway station-Innovation in equipment and construction technology

被引:0
|
作者
Chen, Xiangsheng [1 ,2 ]
Sun, Bo [2 ]
Li, Wei [2 ]
Wu, Yongzhao [3 ]
Zhou, Wenpeng [4 ]
Feng, Meng [5 ]
Wang, Lei [1 ]
Yang, Wensheng [3 ]
Wu, Xiang [4 ]
Long, Weiyi [4 ]
Su, Dong [1 ]
机构
[1] Shenzhen Univ, Shenzhen 518060, Peoples R China
[2] Shenzhen Metro Grp Co Ltd, Shenzhen 518031, Peoples R China
[3] Shenzhen Municipal Design & Res Inst Co Ltd, Shenzhen 518000, Peoples R China
[4] Sinohydro Bur 11 Co Ltd, Zhengzhou 450001, Peoples R China
[5] China Railway Engn Equipment Grp Co Ltd, Zhengzhou 450000, Peoples R China
关键词
Subway station; close-fit pipe jacking of twin tunnels; modular rectangular pipe jacking machine; Structural Transformation; equipment; construction;
D O I
10.1007/s42524-024-0305-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
[No abstract available]
引用
收藏
页码:369 / 376
页数:8
相关论文
empty
未找到相关数据