Bi level optimal dispatching of multi energy virtual power plant influenced by TOU price

被引:0
|
作者
Zhao F. [1 ,2 ]
Fan Y. [1 ]
机构
[1] Engineering Research Center for Renewable Energy Generation & Grid Control, Xinjiang University, Urumqi
[2] State Grid Zhuji Power Supply Company, Zhuji
基金
中国国家自然科学基金;
关键词
Bilevel optimization scheduling; New energy station; Peak load shifting; TOU price; VPP;
D O I
10.19783/j.cnki.pspc.181383
中图分类号
学科分类号
摘要
With the large-scale access of renewable energy sources, its randomness and volatility make it difficult to dispatch the power system and even cause the discarding of the wind. In order to reduce the impact of large-scale new energy access on the power grid, a two-layer optimal scheduling model of virtual power plant based on time sharing price is proposed. In the upper model, the wind and scenery prediction force is declared for the planned force. In view of the deviation between the actual force and the forecast force, the gas turbine and the energy storage battery are coordinated to suppress it. On the basis of the maximum wind and scenery, the minimum deviation compensation scheme is obtained, and the upper force is transferred to the lower layer model. In the lower layer model, the control strategy is set up based on the time sharing price to reduce the net load trough difference, and then the adaptive particle swarm optimization is used to optimize the output of each thermal power unit. Finally, the impact of different wind and solar forecast errors on the economy of the virtual power plant is compared and analyzed, and the change of net load curve caused by pumped storage device is studied. The results show that the model can improve the level of new energy consumption, and the virtual power plant based on TOU price can maximize the profit and ensure the balance of supply and demand in the region. © 2019, Power System Protection and Control Press. All right reserved.
引用
收藏
页码:33 / 40
页数:7
相关论文
共 20 条
  • [1] Liu G., Xiao Y., He Y., Et al., Multi- objective optimal method considering types of grid connected new energy of electric power system, Power System Protection and Control, 45, 10, pp. 31-37, (2017)
  • [2] Shu Y., Zhang Z., Guo J., Et al., Study on key factors and solution of renewable energy accommodation, Proceedings of the CSEE, 37, 1, pp. 1-9, (2017)
  • [3] Zeng M., Yang Y., Xiang H., Et al., Optimal dispatch model based on coordination between "generation-grid-load-energy storage" and demand-side resource, Electric Power Automation Equipment, 36, 2, pp. 102-111, (2016)
  • [4] Xia Y., Liu J., Review of virtual power plant based on distributed generation, Electric Power Automation Equipment, 36, 4, pp. 100-106, (2016)
  • [5] Liu J., Li M., Fang F., Et al., Review on virtual power plants, Proceedings of the CSEE, 34, 29, pp. 5103-5111, (2014)
  • [6] Chen C., Li N., Zhong P., Et al., Review of virtual power plant technology abroad and enlightenment to China, Power System Technology, 37, 8, pp. 2258-2263, (2013)
  • [7] Ai Q., Fan S., Piao L., Optimal scheduling strategy for virtual power plants based on credibility theory, Protection and Control of Modern Power Systems, 1, 1, pp. 48-55, (2016)
  • [8] Feng L., Zhang J., Li G., Et al., Cost reduction of a hybrid energy storage system considering correlation between wind and PV power, Protection and Control of Modern Power Systems, 1, 1, pp. 86-94, (2016)
  • [9] Zhao S., Wang Y., Xu Y., Et al., Coordinated dispatch of large scale energy storage system and thermal generation in high wind power penetration level system based on chance constrained goal programming, Proceedings of the CSEE, 36, 4, pp. 969-977, (2016)
  • [10] Xia Y., Liu J., Optimal scheduling of virtual power plant with risk management, Journal of Power Technologies, 96, 1, pp. 1-8, (2016)