PROBLEMS AND BARRIERS OF ICT UTILIZATION ON IRANIAN CONSTRUCTION SITES: CASE STUDY ON THE SUCCESSFUL USE OF ICT IN REMOTE CONSTRUCTION SITES

被引:0
|
作者
Alaghbandrad, Ali [1 ]
Asnaashari, Ehsan [2 ]
Preece, Christopher [3 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Dept Construct Engn & Management, Tehran, Iran
[2] Nottingham Trent Univ, Sch Architecture Design & Built Environm, Nottingham, England
[3] Univ Teknol Malaysia, Razak Sch Engn & Adv Technol, Dept Civil Engn, Kuala Lumpur, Malaysia
关键词
case study; construction project; ICT barriers; ICT utilization; Iran;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To clarify the current situation of ICT utilization in the Iranian construction industry, twelve semistructured interviews were conducted with highly-experienced construction practitioners and ICT developers in the Iranian construction industry from 2009 to 2010. Interviews were qualitatively analyzed and a narrative interpretation was developed. Results obtained during this survey included identifying the barriers for ICT utilization in the Iranian construction organizations. The problems and barriers were divided into three groups: barriers for ICT usage in construction sites, barriers for ICT usage in head offices and common barriers of ICT usage in construction sites and head offices. This paper will discuss the barriers for ICT usage in construction sites. Some of the interviewees mentioned their company advances in ICT application and overcoming the barriers and problems. This paper focuses on a case study of a successful construction firm in the ICT utilization and overcoming the barriers of ICT adoption on remote construction sites. A study on ICT application in construction projects of this company can draw a pattern for other similar construction firms in Iran and.
引用
收藏
页码:93 / 102
页数:10
相关论文
共 50 条
  • [1] ICT for resource management and telematics in construction sites
    Czart, Wojciech
    Gierszal, Henryk
    Pawlina, Karina
    Urbanska, Maria
    INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBILITY IN SUSTAINABLE CONSTRUCTION, 2017, 208 : 27 - 34
  • [2] A study on the utilization of waste landfill as construction sites
    Chun, BS
    Kim, KM
    GEOTECHNICAL ENGINEERING MEETING SOCIETY'S NEEDS, VOLS 1 AND 2, PROCEEDINGS, 2001, : 213 - 217
  • [3] Review of ICT Implementations for Facilitating Information Flow between Virtual Models and Construction Project Sites
    Alsafouri, Suleiman
    Ayer, Steven K.
    AUTOMATION IN CONSTRUCTION, 2018, 86 : 176 - 189
  • [4] EROSION CONTROL AT CONSTRUCTION SITES - CASE STUDY
    BOND, RL
    SOIL CONSERVATION, 1975, 40 (08): : 18 - 19
  • [5] Empirical Study on Implications of Mobile ICT Use for Construction Project Management
    Hasan, Abid
    Ahn, Seungjun
    Rameezdeen, Raufdeen
    Baroudi, Bassam
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (06)
  • [6] Construction Sites in Town Centers - Problems for Machinery Use.
    Theiner, J.
    Strassen- und Tiefbau, 1988, 42 (04): : 5 - 7
  • [7] The Information-Related Time Loss on Construction Sites: A Case Study on Two Sites
    Xu, Sheng
    Luo, Hanbin
    International Journal of Advanced Robotic Systems, 2014, 11 (08)
  • [8] The information-related time loss on construction sites: A case study on two sites
    Luo, H. (lhblhb1963@vip.sina.com), 1600, InTech Europe, United States (11):
  • [9] The Information-related Time Loss on Construction Sites: A Case Study on Two Sites
    Xu, Sheng
    Luo, Hanbin
    INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2014, 11
  • [10] Stumbling Blocks and Barriers to the Use of ICT in Schools: A Case Study of a Hungarian Town
    Buda, Andras
    INFORMATICS IN EDUCATION, 2020, 19 (02): : 159 - 179