Robust Multi-Objective Job Shop Scheduling Under Uncertainty

被引:0
|
作者
Al-Ashhab, Mohamed S. [1 ,2 ]
Alzahrani, Jaber S. [3 ]
机构
[1] Umm Al Qura Univ, Coll Engn & Islamic Architecture, Dept Mech Engn, Mecca 24211, Saudi Arabia
[2] Ain Shams Univ, Fac Engn, Design & Prod Engn Dept, Cairo 11511, Egypt
[3] Umm Al Qura Univ, Engn Coll Alqunfudah, Dept Ind Engn, Mecca, Saudi Arabia
关键词
Job-Shop Scheduling; Optimization; Uncertainty; Xpress-IVE; Robust; Penalty;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this study, a multi-objective robust job-shop scheduling (JSS) model was developed. The model considered multi -jobs and multi-machines. The model also considered uncertain processing times for all tasks. Each job was assigned a specific due date and a tardiness penalty to be paid if the job was not delivered on time. If any job was completed early, holding expenses would be assigned.In addition, the model added idling penalties to accommodate the idling of machines while waiting for jobs. The problem assigned was to determine the optimal start times for each task that would minimize the expected penalties. A numerical problem was solved to minimize both the makespan and the total penalties, and a comparison was made between the results. Analysis of the results produced a prescription for optimizing penalties that is important to be accounted for in conjunction with uncertainties in the job-shop scheduling problem (JSSP).
引用
收藏
页码:45 / 54
页数:10
相关论文
共 50 条
  • [1] Robust Multi-Objective Job Shop Scheduling Under Uncertainty
    Al-Ashhab, Mohamed S.
    Alzahrani, Jaber S.
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2022, 22 (08): : 45 - 54
  • [2] Robustness measures and robust scheduling for multi-objective stochastic flexible job shop scheduling problems
    Xiao-Ning Shen
    Ying Han
    Jing-Zhi Fu
    Soft Computing, 2017, 21 : 6531 - 6554
  • [3] Robustness measures and robust scheduling for multi-objective stochastic flexible job shop scheduling problems
    Shen, Xiao-Ning
    Han, Ying
    Fu, Jing-Zhi
    SOFT COMPUTING, 2017, 21 (21) : 6531 - 6554
  • [4] Research on multi-objective fuzzy job shop scheduling
    Lei, De-Ming
    Wu, Zhi-Ming
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2006, 12 (02): : 174 - 179
  • [5] Approach for Multi-objective Flexible Job shop scheduling
    Hui, Hongjie
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
  • [6] Study on Job Shop Scheduling Optimization with Multi-objective
    Ze, Tao
    Di, Liang
    Qun, Zhou
    HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2, 2011, 217-218 : 326 - +
  • [7] Dynamic scheduling on multi-objective flexible Job Shop
    Liu, Ai-Jun
    Yang, Yu
    Xing, Qing-Song
    Lu, Hui
    Zhang, Yu-Dong
    Zhou, Zhen-Yu
    Wu, Guang-Hui
    Zhao, Xiao-Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2629 - 2637
  • [8] Study on Multi-objective Dynamic Job Shop Scheduling
    Qi, Lixin
    Liu, Xiaoxia
    ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, PT II, 2011, 7003 : 648 - +
  • [9] Optimization of Multi-objective Job-shop Scheduling under Uncertain Environment
    Wang C.
    Zeng L.
    Journal Europeen des Systemes Automatises, 2019, 52 (02): : 179 - 183
  • [10] Robust scheduling for multi-objective flexible job-shop problems with flexible workdays
    Zhang, Jiae
    Yang, Jianjun
    Zhou, Yong
    ENGINEERING OPTIMIZATION, 2016, 48 (11) : 1973 - 1989