QUALITY INFLUENCE OF GROUTING PROCESS FOR VOLUME STRESS-STRAIN CONDITION OF THE SOILS MASS NEAR THE TUNNEL'S FACE WHICH SITUATED IN THE PROTEROZOIC CLAYS
被引:0
|
作者:
Trushko, V. L.
论文数: 0引用数: 0
h-index: 0
机构:
St Petersburg State Min Univ, St Petersburg, RussiaSt Petersburg State Min Univ, St Petersburg, Russia
Trushko, V. L.
[1
]
Shokov, A. N.
论文数: 0引用数: 0
h-index: 0
机构:
St Petersburg State Min Univ, St Petersburg, RussiaSt Petersburg State Min Univ, St Petersburg, Russia
Shokov, A. N.
[1
]
机构:
[1] St Petersburg State Min Univ, St Petersburg, Russia
The analysis of soils stress-strain condition for different lining including in work period retards from tunnel's face with applying of finite-elements method is adduced. The graphical relations of stresses, displacements, soils inelastic area configuration were obtained. According to these relations final graphical relation of temporary grouting influence for permanent lining stress-strain condition was developed.