共 50 条
- [1] Optimal estimated process parameters side sensitive group runs chart based on expected average run length HELIYON, 2018, 4 (10):
- [6] Optimal Design of Modified Group Runs Scheme with Estimated Process Parameters Based on Expected Average Number of Observations to Signal 2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 395 - 399
- [9] Variable Sample Size EWMA CV Chart Based on Expected Average Run Length 4TH INNOVATION AND ANALYTICS CONFERENCE & EXHIBITION (IACE 2019), 2019, 2138