共 7 条
- [2] Damage to the rear waterwall of BKZ-420-140 NGM boiler caused by a pressure drop in the furnace Power Technol. Eng., 2013, 1 (68-70): : 68 - 70
- [3] Comparing Operation of Gastight Boiler, BkZ-420-140NGM, Under Supercharging and Balanced Draft Conditions. Teploenergetika, 1978, (06): : 29 - 32
- [5] Results of testing a BKZ-420-140NGM boiler firing fuel-oil and equipped with secondary blow Thermal Engineering (English translation of Teploenergetika), 1996, 43 (09):
- [6] A new 1D/3D model of conjugate heat transfer in waterwall tubes of power boiler combustion chamber SELECTED PAPERS FROM IX INTERNATIONAL CONFERENCE ON COMPUTATIONAL HEAT AND MASS TRANSFER (ICCHMT2016), 2016, 157 : 200 - 206