The impact of design decisions on post occupancy processes in school buildings

被引:14
作者
Adeyeye, Kemi [1 ]
Piroozfar, Poorang [1 ]
Rosenkind, Micah [1 ]
Winstanley, Graham [1 ]
Pegg, Ian [2 ]
机构
[1] Univ Brighton, Brighton, E Sussex, England
[2] Buro Happold, London, England
关键词
User studies; Schools; Post occupancy evaluation; Performance management; Design and development; Information management;
D O I
10.1108/02632771311307142
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - This paper aims to review the impact of design and specification decisions for major works during post-occupancy processes; the routine maintenance and management of school premises. It also seeks to explore the relationship between the main stakeholders and how this impacts decision-making and the post-occupancy operation of school buildings. Design/methodology/approach - In addition to a literature review, qualitative data were also obtained through a focus group; a steering group. The steering group consisted of stakeholders tasked with delivering and managing school premises in the Sussex County. Findings - The findings contribute to understanding the impact of design decisions on post-occupancy processes in schools. A basic model is also presented as a guide for requirements and decision mapping in post-occupancy design decision processes in schools. Research limitations/implications - The study was conducted with the participation of a representative sample of stakeholders. There may be the need to investigate the issues further in a localised context before detailed solutions are proposed. Practical implications - The paper reports findings based on the needs, requirements, and preferences of the stakeholders as well as the opportunities and constraints to improving the quality of design processes which in turn will improve post occupancy processes. Originality/value - The paper highlights the complexity of design decision-making in schools, presents the viewpoint of stakeholders, and proposes a basic model to ensure performance for post-occupancy processes to inform the next stage of the research.
引用
收藏
页码:255 / 278
页数:24
相关论文
共 38 条
[1]  
Addy N., 2004, E4135 CONSTR PROD NE
[2]  
[Anonymous], 2006, BUILD B, V99
[3]  
Bertelsen S., 2005, P IGLC 13 C JUL SYDN
[4]  
BJORK BC, 1999, INT J COMPUT INTEG M, V1, P3
[5]   Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques [J].
Bordass, B ;
Leaman, A .
BUILDING RESEARCH AND INFORMATION, 2005, 33 (04) :347-352
[6]  
Bordass B., 2006, POE FEEDBACK GETTING
[7]   Integrating product and process information in the construction sector [J].
Bouchlaghem, D ;
Kimmance, AG ;
Anumba, CJ .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2004, 104 (3-4) :218-233
[8]   Utilization of 2D, 3D, or 4D CAD in construction communication documentation [J].
Cory, CA .
FIFTH INTERNATIONAL CONFERENCE ON INFORMATION VISUALISATION, PROCEEDINGS, 2001, :219-224
[9]  
Department for Education, 2011, OV ENGL SCH BUILD PR
[10]  
Department for Education, 2011, DEP INF