Prototype tests during pull up processes of a multi-bucket foundation dolphin platform

被引:0
|
作者
Ding Hong-yan [1 ]
Zhang Pu-yang [1 ]
机构
[1] Tianjin Univ, Sch Civil Engn, Tianjin 300072, Peoples R China
关键词
multi-bucket foundation; pull up; prototype tests;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Two moot dolphin platforms with bucket foundations were installed in JZ9-3 field of the Bohai Sea in 1999. This also was the first time in China to use the multi-bucket foundation to the platform. Though bucket foundation platform has been installed before, there is no experience in pulling up process of the multi-bucket foundation platform after long time use. The reutilization of buckets is proved in the pulling up test. According to the results, the analysis about the pulling up forces is given; and the results have certain effects to guide the construction procedure and the further study about pulling up forces.
引用
收藏
页码:1585 / 1588
页数:4
相关论文
共 4 条
  • [1] [丁红岩 Ding Hongyan], 2004, [岩土力学, Rock and Soil Mechanics], V25, P386
  • [2] [丁红岩 Ding Hongyan], 2003, [天津大学学报. 自然科学与工程技术版, Journal of Tianjin University], V36, P53
  • [3] SENPERE D, 1982, 14 ANN OFFSH TECHN C, P483
  • [4] XU Ji-zu, 1995, CHINA OFFSHORE OIL G, V7, P32