共 15 条
- [1] BLAST FURNACE CAST HOUSE PRACTICE WITH 2 TAP HOLES .3. DUQUESNE WORKS US STEEL CORP JOURNAL OF METALS, 1968, 20 (02): : 59 - &
- [2] BLAST FURNACE CAST HOUSE PRACTICE WITH 2 TAP HOLES - 1-GREAT LAKES DIV NATIONAL STEEL CORP JOURNAL OF METALS, 1968, 20 (02): : 55 - &
- [3] CAST CONTROL-SYSTEM ON SAKAI NO-2 BLAST-FURNACE OF NIPPON-STEEL-CORP TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S864 - S864
- [4] MECHANIZATION EQUIPMENTS PROVIDED ON TOBATA NO-1 BLAST-FURNACE CAST HOUSE, NIPPON-STEEL-CORP TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S859 - S859
- [5] 2ND FURNACE CAMPAIGN AND RELINING OF BLAST FURNACE-A IN THE HUCKINGEN STEEL WORKS STAHL UND EISEN, 1992, 112 (01): : 23 - 30
- [7] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .1. MODIFICATION AND OPERATION OF REHEATING FURNACE AT NO 2 HOT STRIP MILL IN CHIBA WORKS, KAWASAKI STEEL CORP TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1196 - 1196
- [8] CONSTRUCTION AND OPERATION OF LADLE FURNACE FACILITIES IN NO 2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S247 - S247
- [9] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI STEEL CORP .2. THE DEVELOPMENT OF CERAMICS INSULATION METHODS IN CONTINUOUS REHEATING FURNACE TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1182 - 1182
- [10] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .2. DEVELOPMENT OF SLAB UNIFORM HEATING TECHNIQUES TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1197 - 1197