Reply: Time to start implementing lean and six sigma in the catheterization laboratory

被引:2
|
作者
Agarwal, Shikhar [1 ]
Agarwal, Kanika Khanna
Parashar, Akhil [2 ]
Kapadia, Samir [3 ]
机构
[1] Geisinger Med Ctr, Intervent Cardiol, Danville, PA 17821 USA
[2] Cleveland Clin, Internal Med, Cleveland, OH 44106 USA
[3] Cleveland Clin, Intervent Cardiol, Cleveland, OH 44106 USA
关键词
D O I
10.1016/j.carrev.2016.11.002
中图分类号
R5 [内科学];
学科分类号
1002 ; 100201 ;
摘要
引用
收藏
页码:504 / 504
页数:1
相关论文
共 50 条
  • [1] Time to start implementing Lean and Six Sigma in the catheterization laboratory
    Krittanawong, Chayakrit
    Kitai, Takeshi
    Sun, Tao
    CARDIOVASCULAR REVASCULARIZATION MEDICINE, 2016, 17 (08) : 503 - 503
  • [2] Reducing Mold Changing Time by Implementing Lean Six Sigma
    Lee, Kuo-Liang
    Wei, Chun-Chin
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2010, 26 (04) : 387 - 395
  • [3] Impact of lean six sigma process improvement methodology on cardiac catheterization laboratory efficiency
    Agarwal, Shikhar
    Gallo, Justin J.
    Parashar, Akhil
    Agarwal, Kanika K.
    Ellis, Stephen G.
    Khot, Umesh N.
    Spooner, Robin
    Tuzcu, Emin Murat
    Kapadia, Samir R.
    CARDIOVASCULAR REVASCULARIZATION MEDICINE, 2016, 17 (02) : 95 - 101
  • [4] An outline of the "Control Phase" for implementing Lean Six Sigma
    Sarkar, Ashok
    Mukhopadhyay, Arup Ranjan
    Ghosh, Sadhan Kumar
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2014, 5 (03) : 230 - 252
  • [5] Implementing Lean Six Sigma in a Kuwaiti private hospital
    Al-Zain, Yazan
    Al-Fandi, Lawrence
    Arafeh, Mazen
    Salim, Samar
    Al-Quraini, Shouq
    Al-Yaseen, Aisha
    Abu Taleb, Deema
    INTERNATIONAL JOURNAL OF HEALTH CARE QUALITY ASSURANCE, 2019, 32 (02) : 431 - 446
  • [6] Improved Laboratory Stat Test Turnaround Time Using Lean Six Sigma
    Stapleton, Kathleen
    Sammond, Douglas
    AMERICAN JOURNAL OF CLINICAL PATHOLOGY, 2012, 138 : A184 - A184
  • [7] Implementing Lean Six Sigma in healthcare: issues from Italy
    Chiarini, Andrea
    Bracci, Enrico
    PUBLIC MONEY & MANAGEMENT, 2013, 33 (05) : 361 - 368
  • [8] Lean Six Sigma improves OR supply chain management for first case on-time start
    Banchs, R. J.
    Maria, B. De Jose
    Muller, S.
    Grass, R.
    EUROPEAN JOURNAL OF ANAESTHESIOLOGY, 2010, 27 (01) : 20 - 21
  • [9] Lean Six Sigma Methodologies to Reduce the Cardiac Troponin Turnaround Time in the Core Laboratory
    Vasani, Niketa M.
    Patel, Biren D.
    Stanford, Brian J.
    LABORATORY MEDICINE, 2023, 54 (02) : E49 - E53
  • [10] Investigating the green impact of Lean, Six Sigma and Lean Six Sigma
    Chugani, Nashmi
    Kumar, Vikas
    Garza-Reyes, Jose Arturo
    Rocha-Lona, Luis
    Upadhyay, Arvind
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2017, 8 (01) : 7 - 32