INVESTMENT CRITERIA AND CHOICE OF PRODUCTION-RATE IN PLANNING OF GOLD-MINE PRODUCTION

被引:0
|
作者
NAPIER, JAL
机构
关键词
Compendex;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
GOLD MINES AND MINING
引用
收藏
页码:221 / 228
页数:8
相关论文
共 50 条
  • [1] A MODEL OF CAPITAL EXPENDITURE FOR GOLD-MINE PLANNING
    NAPIER, JAL
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1981, 81 (07): : 212 - 220
  • [2] INVESTMENT CRITERIA AND CHOICE OF TECHNIQUES OF PRODUCTION
    SRINIVASAN, TN
    YALE ECONOMIC ESSAYS, 1962, 2 (01): : 58 - 115
  • [3] A criteria to optimize mine production rate
    Ji, CS
    Zhang, YD
    COMPUTER APPLICATIONS IN THE MINERALS INDUSTRIES, 2001, : 299 - 301
  • [4] DISCUSSIONS ON DETERMINATION OF THE OPTIMUM PRODUCTION-RATE AND LIFE OF THE UNDERGROUND MINE
    REN, Y
    ZU, ZL
    FENG, ZR
    JOURNAL OF WUHAN UNIVERSITY OF TECHNOLOGY-MATERIALS SCIENCE EDITION, 1995, 10 (02): : 51 - 57
  • [5] ELECTRON PRODUCTION-RATE IN IONOSPHERE
    ALBERCA, LF
    TRANSACTIONS-AMERICAN GEOPHYSICAL UNION, 1977, 58 (09): : 913 - 913
  • [6] Open pit mine production design of planning at mclaughlin gold mine
    Artittong, S.
    Dagdelen, K.
    Gurgur, C.Z.
    Bulk Solids Handling, 2010, 30 (01): : 32 - 36
  • [7] A DISCRETE OPTIMAL-CONTROL ALGORITHM FOR PRODUCTION PLANNING INCORPORATING COST OF CHANGES IN PRODUCTION-RATE
    SINGHAL, K
    HEINTZ, TJ
    INFOR, 1981, 19 (02) : 125 - 132
  • [8] EFFECT OF TEMPERATURE ON PRODUCTION-RATE IN CHROMATOGRAPHY
    BUYS, TS
    CLERK, KD
    SEPARATION SCIENCE, 1973, 8 (05): : 551 - 565
  • [9] ACETATE PRODUCTION-RATE IN CECUM OF PONY
    GLINSKY, MJ
    SMITH, RM
    DAVIS, CL
    JOURNAL OF ANIMAL SCIENCE, 1975, 41 (01) : 314 - 314
  • [10] AIRBUS SEEKS STABLE PRODUCTION-RATE
    不详
    AVIATION WEEK & SPACE TECHNOLOGY, 1994, 140 (02): : 33 - &