共 50 条
- [2] MANAGING OF A STRATEGIC CRUDE OIL PIPELINE FOR MAXIMUM TRANSPORTATION CAPACITY PROCEEDINGS OF THE ASME INDIA OIL AND GAS PIPELINE CONFERENCE, 2013, 2013,
- [3] PARAMETERS OF THE PIPELINE, TRANSFERABLE FOR PUMPOVER OF GAS-SATURATED OIL NEFTYANOE KHOZYAISTVO, 1981, (08): : 51 - 52
- [4] ESTIMATION OF THE CONDITIONS OF PIPELINE OPERATION DURING PUMP-OVER OF GAS-SATURATED OIL NEFTYANOE KHOZYAISTVO, 1979, (07): : 45 - 46
- [6] Study on the adjacent pipeline failure consequence model of oil-gas transportation pipeline PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2009, : 494 - 498
- [7] Secondary market and futures market for the provision of gas pipeline transportation capacity ENERGY JOURNAL, 2003, 24 (01): : 23 - 47
- [8] Efficiency of a Pipeline Converted to the Transport of Gas-Saturated Oil. Neftyanoe Khozyaistvo, 1979, (12): : 54 - 56
- [9] Calculation of the Main Parameters of an Oil Pipeline Transporting Gas-Saturated Oil. Oil Industry, 1975, (01): : 39 - 41
- [10] Failure Analysis of the Leakage and Ignition of an Oil–Gas Mixture Transportation Pipeline Journal of Failure Analysis and Prevention, 2022, 22 : 259 - 266