共 50 条
- [1] COST-ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH 2 TYPES OF OPERATION AND REPAIR MICROELECTRONICS AND RELIABILITY, 1985, 25 (01): : 71 - 75
- [2] STOCHASTIC-ANALYSIS OF A 2 UNIT COLD STANDBY SYSTEM WITH PREPARATION TIME FOR REPAIR MICROELECTRONICS AND RELIABILITY, 1987, 27 (01): : 55 - 60
- [3] COST-ANALYSIS OF A 2-DISSIMILAR UNIT COLD STANDBY REDUNDANT SYSTEM WITH ADMINISTRATIVE DELAY AND NO PRIORITY IN REPAIR MICROELECTRONICS AND RELIABILITY, 1990, 30 (06): : 1155 - 1177
- [4] COST-ANALYSIS OF A 2 UNIT COLD STANDBY SYSTEM UNDER DIFFERENT WEATHER CONDITIONS MICROELECTRONICS AND RELIABILITY, 1985, 25 (04): : 655 - 659
- [5] COST-ANALYSIS IN A 2-UNIT STANDBY SYSTEM WITH A REGULAR REPAIRMAN AND PATIENCE TIME MICROELECTRONICS AND RELIABILITY, 1984, 24 (03): : 453 - 459
- [7] COST-ANALYSIS OF A 2-UNIT WARM STANDBY RELIABILITY SYSTEM WITH 2 TYPES OF REPAIR FACILITIES MICROELECTRONICS AND RELIABILITY, 1985, 25 (04): : 681 - 689
- [8] COMMENTS ON STOCHASTIC-ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH PREPARATION TIME FOR REPAIR MICROELECTRONICS AND RELIABILITY, 1988, 28 (05): : 687 - 687
- [9] COST-ANALYSIS OF A 2 DISSIMILAR COLD STANDBY SYSTEM WITH PREVENTIVE MAINTENANCE AND REPLACEMENT OF STANDBY MICROELECTRONICS AND RELIABILITY, 1994, 34 (01): : 171 - 174
- [10] COST-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH 2 TYPES OF REPAIRMEN MICROELECTRONICS AND RELIABILITY, 1984, 24 (05): : 849 - 855