SCHEDULING SEMICONDUCTOR WAFER FABRICATION

被引:330
|
作者
WEIN, LM
机构
[1] MIT, Cambridge, MA, USA
关键词
D O I
10.1109/66.4384
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
23
引用
收藏
页码:115 / 130
页数:16
相关论文
共 50 条
  • [1] Modeling and Scheduling for Semiconductor Wafer Fabrication Systems
    Shao Zhifang
    Chen Yu
    7TH INTERNATIONAL CONFERENCE ON SYSTEM SIMULATION AND SCIENTIFIC COMPUTING ASIA SIMULATION CONFERENCE 2008, VOLS 1-3, 2008, : 1177 - 1182
  • [2] Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility
    Kim, Yeong-Dae
    Joo, Byung-Jun
    Choi, So-Young
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2010, 23 (02) : 246 - 254
  • [3] An Optimization Approach for Semiconductor Wafer Fabrication Scheduling Problem
    Cao Zheng-cai
    Qia Fei
    Wu Qi-di
    MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2465 - +
  • [4] Shift scheduling for steppers in the semiconductor wafer fabrication process
    Kim, Sooyoung
    Yea, Seung-Hee
    Kim, Bokang
    IIE Transactions (Institute of Industrial Engineers), 2002, 34 (02): : 167 - 177
  • [5] Dynamic scheduling rule selection for semiconductor wafer fabrication
    Hsieh, BW
    Chang, SC
    Chen, CH
    2001 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS I-IV, PROCEEDINGS, 2001, : 535 - 540
  • [6] PRACTICAL ISSUES IN SCHEDULING AND DISPATCHING IN SEMICONDUCTOR WAFER FABRICATION
    JOHRI, PK
    JOURNAL OF MANUFACTURING SYSTEMS, 1993, 12 (06) : 474 - 485
  • [7] Shift scheduling for steppers in the semiconductor wafer fabrication process
    Kim, S
    Yea, SH
    Kim, B
    IIE TRANSACTIONS, 2002, 34 (02) : 167 - 177
  • [8] Scheduling semiconductor wafer fabrication with optimization of multiple objectives
    Wang, Zuntong
    Qiao, Fei
    Wu, Qidi
    2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 253 - +
  • [9] A problem reduction approach for scheduling semiconductor wafer fabrication facilities
    Upasani, Abhijit A.
    Uzsoy, Reha
    Sourirajan, Karthik
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2006, 19 (02) : 216 - 225
  • [10] GA Based Approach for Optimized Scheduling in a Semiconductor Wafer Fabrication
    Cao, Zheng-Cai
    Qiao, Fei
    Wu, Qi-Di
    WORLD SUMMIT ON GENETIC AND EVOLUTIONARY COMPUTATION (GEC 09), 2009, : 1065 - 1068