AUTOMATING CALCULATION OF PRODUCTION EQUIPMENT IDLING TIME

被引:0
|
作者
ZHURAVLE.LA
机构
来源
RUSSIAN ENGINEERING JOURNAL-USSR | 1969年 / 49卷 / 03期
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:86 / &
相关论文
共 50 条
  • [1] AUTOMATING EARTHMOVING EQUIPMENT.
    Ward, Carter J.
    World Construction, 1975, 28 (06): : 44 - 47
  • [2] AUTOMATING ELECTRONIC ASSEMBLY EQUIPMENT
    CARDANI, CP
    SEMICONDUCTOR PRODUCTS AND SOLID STATE TECHNOLOGY, 1966, 9 (06): : 45 - &
  • [3] Automating production of run-time reconfigurable designs
    Shirazi, N
    Luk, W
    Cheung, PYK
    IEEE SYMPOSIUM ON FPGAS FOR CUSTOM COMPUTING MACHINES, PROCEEDINGS, 1998, : 147 - 156
  • [4] Calculation of production capacity of mechanized mining face equipment
    Zheng, Xinchou
    Coal Science and Technology (Peking), 1993, 21 (11):
  • [5] STUDIES OF CALCULATION OF SYSTEMS DEPENDABILITY IN POWER PRODUCTION EQUIPMENT
    HOLLAN, J
    ENERGIETECHNIK, 1977, 27 (08): : 325 - 328
  • [6] Equipment available for automating rig operations
    McNair, Will L., 1600, (88):
  • [7] A Real-time Equipment Interface for Controlling Production Equipment
    Lee, Seung-Woo
    Nam, So-Jeong
    Lee, Jai-Kyung
    2012 12TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND SYSTEMS (ICCAS), 2012, : 1173 - 1177
  • [8] TIME PASSES AND EQUIPMENT AGES - CORRECT CALCULATION OF DEPRECIATION
    不详
    AGRICULTURA DE LAS AMERICAS, 1977, 26 (02): : 10 - 10
  • [9] PRODUCTION TIME AND CALCULATION OF VALUE STRUCTURE OF PRODUCTION
    KVASHA, I
    PROBLEMS OF ECONOMICS, 1977, 20 (04): : 3 - 24
  • [10] Calculation of Yoke Joints of Production Oil Well Equipment.
    Bagirov, E.G.
    Izvestiya Vysshikh Uchebnykh Zavedenii, Neft i Gaz, 1979, (03): : 82 - 86