DECENTRALIZED PLANNING OF HYDROELECTRIC POWER-SYSTEMS

被引:1
|
作者
BINATO, S
PEREIRA, MVF
机构
[1] FED UNIV RIO DE JANEIRO,DEPT SYST,RIO JANEIRO,BRAZIL
[2] CEPEL,BR-20001970 RIO JANEIRO,BRAZIL
关键词
MARGINAL COST THEORY; HYDROELECTRIC SYSTEMS; RESOURCE PLANNING;
D O I
10.1109/59.373975
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the remuneration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed.
引用
收藏
页码:492 / 498
页数:7
相关论文
共 50 条