TUBE AND PIPE EDGE PREPARATION CALLS FOR THE RIGHT EQUIPMENT

被引:0
|
作者
DIGIACOMO, J
机构
关键词
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
引用
收藏
页码:47 / 50
页数:4
相关论文
共 50 条
  • [1] Choosing equipment for preparation of tube and plate for welding
    Cargill, I.
    Welding and Metal Fabrication, 1994, 62 (01): : 29 - 30
  • [2] Design and development of tube edge preparation stand
    Anandakumar, R.
    Balasubramanian, K. R.
    Sivapirakasam, S. P.
    Gopanna, Kuruva
    Dinagaran, D.
    MATERIALS TODAY-PROCEEDINGS, 2021, 46 : 9604 - 9609
  • [3] Making the Cut: Pick the Right Cutting Technology for Pipe, Tube or Profile
    Preiato, Ernie
    Czarnik, Dave
    Plastics Technology, 2020, 66 (05) : 46 - 49
  • [4] Corrosion Protection of Pipe Steel in Petroleum Gas Preparation and Drying Equipment
    Ivanov, E. S.
    Artamonova, I. V.
    Ivanov, S. S.
    Guzenkova, A. S.
    CHEMICAL AND PETROLEUM ENGINEERING, 2018, 54 (5-6) : 359 - 363
  • [5] A kind of adjustable electric heating pipe power electrode preparation equipment
    Li, Gang
    Zhu, X. L.
    POWER AND ENERGY SYSTEMS III, 2014, 492 : 71 - +
  • [6] CAUTIOUS CALLS IN CAPITAL EQUIPMENT
    SERWER, AE
    FORTUNE, 1987, 115 (13) : 172 - 172
  • [7] EQUIPMENT FOR PIPE EXTRUSION
    SCHARWACHTER, D
    KUNSTSTOFFE-GERMAN PLASTICS, 1988, 78 (10): : 957 - 959
  • [8] EQUIPMENT FOR PIPE INTERIORS
    不详
    METAL CONSTRUCTION, 1978, 10 (10): : 474 - 474
  • [9] CUTOFF CALLS AND TELEPHONE EQUIPMENT RELIABILITY
    TORTORELLA, M
    BELL SYSTEM TECHNICAL JOURNAL, 1981, 60 (08): : 1861 - 1889
  • [10] Right equipment right task
    McCoy, Megan
    Modern Materials Handling, 2003, 58 (13) : 35 - 36