Study of reasonable width of full-mechanized top-coal caving with large mining height

被引:0
|
作者
Kong De-zhong [1 ]
Wang Zhao-hui [1 ]
Li Xiao-meng [1 ]
Wang Yan-liang [1 ]
Wang Chuan [1 ]
机构
[1] China Univ Min & Technol Beijing, Fac Resources & Safety Engn, Beijing 100083, Peoples R China
关键词
full-mechanized top-coal caving with large mining height; the side abutment pressure; segment pillar; numerical simulation;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The side abutment pressure distribution, the resources recovery, the stability of coal pillar and the mining roadway are considered in determining reasonable width of full-mechanized top-coal caving with large mining height. In order to determine the reasonable width, taking the 8103 mine as the engineering background, firstly, the side abutment pressure distribution of full-mechanized top-coal caving with large mining height is studied by using stress monitoring and theoretical calculation; and 8 m in width of low stress zone, more than 28 m in width of original rock stress zone are determined. Secondly, the width of fractured zone in side coal mass of full-mechanized top-coal caving with large mining height is determined by using engineering analogy and numerical simulation, and about 4 m in width of fractured zone is determined. Finally, the stress, the deformation and fracture and displacement of the gateway excavating and the coal pillars under different widths of coal pillars are simulated by FLAC(3D). The study results show that the coal pillar almost have no bearing capacity and the roadway has large deformation and failure under the influence of mining abutment pressure when the width of segment pillar is 6 m or 8 m; the coal pillar has the stronger bearing capacity and the roadway has small deformation and failure under the influence of mining abutment pressure when the width of segment pillar is 28 m or 30 m. All in all, various elements such as resources recovery, roadway support control, and secondary disaster control are considered comprehensively; and the reasonable width of segment pillar of full-mechanized top-coal caving with large mining height is determined as 28 m.
引用
收藏
页码:460 / 466
页数:7
相关论文
共 15 条
  • [1] [柏建彪 Bai Jianbiao], 2004, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V23, P3475
  • [2] [贾光胜 Jia Guangsheng], 2002, [煤炭学报, Journal of China Coal Society], V27, P6
  • [3] LI De-zhong, 2010, ROCK SOIL MECH, V30, P109
  • [4] Liu JH, 2010, ROCK SOIL MECH, V31, P4011
  • [5] LIU Jin-hai, 2012, CHINESE J ROCK MECH, V31, P922
  • [6] LIU Zeng-hui, 2005, GROUND PRESSURE STRA, V22, P24
  • [7] Qin Yongyang X., 2010, COAL SCI TECHNOL, V38, P15
  • [8] Si RJ, 2007, ROCK SOIL MECH, V28, P351
  • [9] TU Shi-hao, 2011, J MINING SAFETY ENG, V28, P506
  • [10] WANG Wei-jun, 2001, ROCK SOIL MECH, V22, P319