The Impact of Yield-Dependent Trading Costs on Pricing and Production Planning Under Supply Uncertainty

被引:146
|
作者
Kazaz, Burak [1 ]
Webster, Scott [1 ]
机构
[1] Syracuse Univ, Whitman Sch Management, Syracuse, NY 13244 USA
关键词
supply uncertainty; risk aversion; yield-dependent trading costs; pricing; fruit futures; NEWSVENDOR;
D O I
10.1287/msom.1110.0335
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies the role of the yield-dependent trading cost structure influencing the optimal choice of the selling price and production quantity for a firm that operates under supply uncertainty in the agricultural industry. The firm initially leases farm space, but its realized amount of fruit supply fluctuates because of weather conditions, diseases, etc. At the end of the growing season, the firm has three options: convert its crop supply to the final product, purchase additional supplies from other growers, and sell some (or all) of its crop supply in the open market without converting to the finished product. We consider the problem both from a risk-neutral and a risk-averse perspective with varying degrees of risk aversion. The paper offers three sets of contributions: (1) It shows that the use of a static cost exaggerates the initial investment in the farm space and the expected profit significantly, and the actual value gained from a secondary (emergency) option for an agricultural firm is lower under the yield-dependent cost structure. (2) It proves that although the risk-neutral firm does not benefit from fruit futures, a sufficiently risk-averse firm can benefit from the presence of a fruit futures market. The same risk-averse firm does not purchase fruit futures when it operates under static costs. Thus, fruit futures can only add value under yield-dependent trading costs. (3) Contrary to the results presented for the newsvendor problem under demand uncertainty, the firm does not always commit to a lower initial quantity (leased farm space) under risk aversion. Rather, the firm might lease a larger farm space under risk aversion.
引用
收藏
页码:404 / 417
页数:14
相关论文
共 50 条
  • [41] A model for supply planning under lead time uncertainty
    Dolgui, A
    Ould-Louly, MA
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 78 (02) : 145 - 152
  • [42] Fundamental Theorem of Asset Pricing Under Transaction Costs and Model Uncertainty
    Bayraktar, Erhan
    Zhang, Yuchong
    MATHEMATICS OF OPERATIONS RESEARCH, 2016, 41 (03) : 1039 - 1054
  • [43] Analysis of ordering and pricing strategy for supply chain with consumer deliberation under supply uncertainty
    Ma, Lijun
    Wang, Lan
    Feng, Zhiyan
    Feng, Jingqiang
    2019 16TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM2019), 2019,
  • [44] Pricing of remanufacturing supply chain considering quality upgrading under carbon trading
    Yuan K.
    Wu G.
    He B.
    Ren T.
    Wang D.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (05): : 1586 - 1602
  • [45] Incorporating CO2 emission trading in the optimal design and planning of chemical supply chain networks under uncertainty
    Ruiz-Femenia, Ruben
    Salcedo-Diaz, Raquel
    Guillen-Gosalbez, Gonzalo
    Caballero, Jose A.
    Jimenez, Laureano
    22 EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2012, 30 : 127 - 131
  • [46] Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty
    Talay, Isilay
    Ozdemir-Akyildirim, Oznur
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 275 (02) : 536 - 551
  • [48] Pricing and coordination in a supply chain with risk aversion under cost uncertainty
    Zhao, Cong
    Wang, Qian
    PROCEEDINGS OF THE 36TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC 2024, 2024, : 5798 - 5804
  • [49] DISAGGREGATION UNDER UNCERTAINTY IN HIERARCHICAL PRODUCTION PLANNING
    ARI, EA
    AXSATER, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 35 (02) : 182 - 186
  • [50] Material planning for production kits under uncertainty
    Choobineh, F
    Mohebbi, E
    PRODUCTION PLANNING & CONTROL, 2004, 15 (01) : 63 - 70