Single Machine Scheduling Proportionally Deteriorating Jobs with Ready Times Subject to the Total Weighted Completion Time Minimization

被引:23
|
作者
Lv, Zheng-Guo [1 ]
Zhang, Li-Han [1 ]
Wang, Xiao-Yuan [1 ]
Wang, Ji-Bo [1 ]
机构
[1] Shenyang Aerosp Univ, Sch Comp, Shenyang 110136, Peoples R China
关键词
scheduling; single machine; proportional job deterioration; release dates; total weighted completion time; REJECTION;
D O I
10.3390/math12040610
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In this paper, we investigate a single machine scheduling problem with a proportional job deterioration. Under release times (dates) of jobs, the objective is to minimize the total weighted completion time. For the general condition, some dominance properties, a lower bound and an upper bound are given, then a branch-and-bound algorithm is proposed. In addition, some meta-heuristic algorithms (including the tabu search (TS), simulated annealing (SA) and heuristic (NEH) algorithms) are proposed. Finally, experimental results are provided to compare the branch-and-bound algorithm and another three algorithms, which indicate that the branch-and-bound algorithm can solve instances of 40 jobs within a reasonable time and that the NEH and SA are more accurate than the TS.
引用
收藏
页数:15
相关论文
共 50 条