Environmental impacts from traffic on highway construction work zones: Framework and simulations

被引:2
|
作者
Kim, Changmo [1 ,2 ]
Butt, Ali Azhar [1 ,2 ]
Harvey, John T. [1 ,2 ]
Ostovar, Maryam [2 ]
机构
[1] Univ Calif Pavement Res Ctr, Davis, CA 95616 USA
[2] Univ Calif Davis, Dept Civil & Environm Engn, Davis, CA 95616 USA
关键词
Construction work zone; freeway/highways; greenhouse gas emissions; life cycle assessment; pilot car operations; POLLUTANT EMISSIONS;
D O I
10.1080/15568318.2024.2392624
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Emissions from internal combustion engine vehicles on highways are the major contributors to global warming in the United States. Transportation sector pavement-related emissions come from gasolines and diesel use in vehicles from pavement-vehicle interaction, which is affected by pavement conditions, and by the trucking of new pavement materials and demolition. The objective of this study was to develop a framework for determining the fuel use resulting in environmental impacts caused by construction work zones (CWZs) on a range of vehicles and to produce initial calculations of these impacts by modeling traffic closure conditions for highway maintenance and rehabilitation activities. The study included two common highway categories-freeways/multi-lane highways and two-lane highways. The framework was demonstrated using three CWZ operations under different traffic congestion levels. In the simulation results for a freeway with a CWZ and heavy congestion, fuel consumption increased by 85% and the carbon-dioxide equivalent emissions increased by 86%. Changing CWZ traffic congestion from heavy (average speed 5 mph) to medium (average speed 25 mph for a freeway section) reduced fuel consumption by 40% on a freeway. This study also included use of a pilot car in a CWZ on a two-lane road typical of lower traffic volume state highways and county roads to compare with the drive cycles in MOVES used for the scenarios. The pilot-car operation scenario results indicate that a one-lane closure with pilot-car operation on a two-lane road might consume 13% excess fuel because of idling time and the slow movement of vehicles following the pilot car.
引用
收藏
页码:680 / 694
页数:15
相关论文
共 50 条
  • [41] Understanding Air Pollution from Induced Traffic during and after the Construction of a New Highway: Case Study of Highway 25 in Montreal
    Amin, Md. Shohel Reza
    Tamima, Umma
    Jimenez, Luis Amador
    JOURNAL OF ADVANCED TRANSPORTATION, 2017,
  • [42] Integrating Activities Risk and Traffic Microsimulation Data for Temporal Risk Assessment in Construction Work Zones: A Proof of Concept
    Sankaran, Bharathwaj
    France-Mensah, Jojo
    O'Brien, William J.
    COMPUTING IN CIVIL ENGINEERING 2017: SENSING, SIMULATION, AND VISUALIZATION, 2017, : 254 - 261
  • [43] A Hybrid Framework for Predicting Crash Severity in Construction Work Zones Using Knowledge Distillation and Conditional GANs
    Mashhadi, Ali Hassandokht
    Rashidi, Abbas
    Medina, Juan C.
    Markovic, Nikola
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2025, 39 (02)
  • [44] Assessing and mitigating environmental impacts of construction materials: Insights from environmental product declarations
    Yu, Zhonghan
    Nurdiawati, Anissa
    Kanwal, Qudsia
    Al-Humaiqani, Mohammed M.
    Al-Ghamdi, Sami G.
    JOURNAL OF BUILDING ENGINEERING, 2024, 98
  • [45] Portable Traffic Signals in Conjunction with Pilot Car Operations at Two-Lane, Two-Way Rural Highway Work Zones
    Schrock, Steven D.
    Patil, Shivraj S.
    Fitzsimmons, Eric J.
    TRANSPORTATION RESEARCH RECORD, 2016, (2555) : 72 - 80
  • [46] RETRACTED: Framework Construction of Traffic Environmental Monitoring and Early-Warning System (Retracted Article)
    Song Cheng
    Zhang Xi-ming
    Ma Zhao
    2011 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENTAL SCIENCE-ICEES 2011, 2011, 11
  • [47] Assessment and management of air emissions and environmental impacts from the construction industry
    Wang, Bao Zhen
    Zhu, Zhen Hua
    Yang, Ende
    Chen, Zhi
    Wang, Xiang Hong
    JOURNAL OF ENVIRONMENTAL PLANNING AND MANAGEMENT, 2018, 61 (14) : 2421 - 2444
  • [48] Modeling Speed Behavior of Passenger Cars and Trucks in Freeway Construction Work Zones: Implications on Work Zone Design and Traffic Control Decision Processes
    Porter, Richard J.
    Mason, John M., Jr.
    JOURNAL OF TRANSPORTATION ENGINEERING, 2008, 134 (11) : 450 - 458
  • [49] Simulation Models for Assessment of the Impacts of Strategies for Highway Work Zones Eight Case Studies Along Interstate Highways and State Routes in New England
    Collura, John
    Heaslip, Kevin P.
    Moriarty, Kevin
    Wu, Francis
    Khanta, Raju
    Berthaume, Andrew
    TRANSPORTATION RESEARCH RECORD, 2010, (2169) : 62 - 69
  • [50] Directional Sound for Long-Distance Auditory Warnings From a Highway Construction Work Zone
    Phanomchoeng, Gridsada
    Rajamani, Rajesh
    Hourdos, John
    IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2010, 59 (05) : 2266 - 2276